UDT02 Links Tab of the UDT09 Screen

Use the UDT02 Links tab of the UDT09 screen to add and/or delete UDT02 links. A table of currently linked items displays.

UDT02 Direct Links Subtask

Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of Configuration > General Controls > Configure General Settings. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
Note: If your version of Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only, because modifications must be applied directly to the appropriate area within Costpoint.
Field Description
UDT02

This column displays the currently linked UDT02s.

Description

This column displays the currently linked UDT02 descriptions.

UDT02 Wildcard Links Subtask

Field Description
UDT09

This column displays the currently linked UDT09.

UDT02

This column displays the currently linked wildcard UDT02s.