UDT02 Links Tab of the UDT09 Screen
Use the UDT02 Links tab of the UDT09 screen to add and/or delete UDT02 links. A table of currently linked items displays.
UDT02 Direct Links Subtask
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
Note: If your version of Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only, because modifications must be applied directly to the appropriate area within Costpoint.
Field | Description |
---|---|
UDT02 |
This column displays the currently linked UDT02s. |
Description |
This column displays the currently linked UDT02 descriptions. |
UDT02 Wildcard Links Subtask
Field | Description |
---|---|
UDT09 |
This column displays the currently linked UDT09. |
UDT02 |
This column displays the currently linked wildcard UDT02s. |
Parent Topic: UDT09S